All studies and reports included in this series were produced as part of the larger national defense planning process begun by the federal government in the 1970s. The U.S. Air Force sponsored most of these missile planning and environmental evaluation activities. The first studies done as part of this larger process are not collected in this series, but they compared the merits of various types of missiles and alternate deployment systems. A site selection process then narrowed down potential locations in the U.S. for deployment of the system. Once selected as a potential location, the environmental impact of deploying the missile had to be studied before deployment could be approved.

Collected in this series are those reports and studies that were undertaken after the Great Basin area had been selected as a prime location for deployment of the system and after the missile basing mode had been selected. Federal law required that an environmental impact statement be written before the MX missile system could be deployed. Most of the studies now part of this series were undertaken in response to this requirement and were produced by U.S. Air Force subcontractors.

Hennigson, Durham, and Richardson (HDR) was hired as the Air Force's chief subcontractor, and they either hired other subcontractors to complete specific studies, or they completed the work themselves. Still other subcontractors studied potential sites for the main operating bases and for missile storage and tracking facilities. These included FUGRO inc., its successor, Earth Technology Resources Corp., (ERTEC), and EDAW CO.

Both the environmental studies and those done to select locations for facilities were part of the "tiered" process of evaluation. Usually, subcontractors did preliminary studies to identify what types of impacts could be expected from the project and which sites would be the most ideal for physical deployment. Based on these, plans for later work were developed and recommendations for more detailed studies were made. The later more detailed reports focus more upon the specific impacts that missile deployment would have on social, economic, and cultural life in the Great Basin area, or they evaluate specific missile basing and storage sites. This progression of more detailed reports that expanded upon data collected earlier, explains the similarity between contents and organization of each group.

Data was collected at different points in the planning and evaluation process and were then often circulated to others in state government or to private contractors who also evaluated them.

The eight different subseries can therefore be grouped loosely into two categories: those that were produced directly because of the environmental evaluation process, and those that were produced to study the best sites, from a technical standpoint, where the missiles could be physically located. The missile siting studies contain more technical data than do the environmental impacts statements, some of this was also used in the preparation of the environmental impact statements, even though this was not their main purpose. Each subseries is described in more detail below.

The Final Environmental Impact Statement - MX Milestone II are the earliest set of reports in the series and were completed in 1978. They compare the various basing mode options then available for deploying the MX missile system. The environmental implications for the main deployment areas of using each basing mode are analyzed. Like environmental impact statements produced later, the Milestone II statement follows a very structured format. The first chapter gives an overview of the project; the interior chapters compare the various alternatives and make judgments about the merits of each; the appendices contain various technical reports or planning data; and the final chapter collects and summarizes public comments.

Environmental Technical reports were produced by HDR as the project moved into its second phase in 1979/80. The subject of each report is a separate aspect of the anticipated problems that would be caused by missile deployment. Many are obviously planning reports, designed to survey potential impacts or to set direction for further detailed study. Others summarize current economic and social conditions or legal requirements affecting the project. The reports are numbered consecutively, although there are many gaps. Apparently these were acquired individually by MX Coordination Office staff as the state's effort to plan for deployment expanded.

The Deployment Area Selection and Land Withdrawal/Acquisition Draft Environment Impact Statement (DEIS) and accompanying environmental technical reports were also produced for the Air Force by HDR. Released in 1980, the statement compares the alternatives for site selection and describes in greater detail than the preliminary studies, possible environmental impacts of missile deployment in Utah/Nevada and Texas/New Mexico. Considered also in the selection process were the mitigation measures proposed to reduce deployment impacts on threatened resources in these areas. Attached to the statement itself is a group of technical reports that compares anticipated environmental impacts in specific alternative siting areas. Resource needs for the construction phase of the project, or anticipated impacts on wildlife, vegetation, transportation networks, etc. are the focus of others. It is this subseries which is the focus of detailed evaluation by the Utah MX Coordination Office staff.

The Preliminary Draft Final Environmental Impact Statement (PDFEIS) is essentially an updated version of DEIS. After President Reagan announced the cancellation of the MX MPS system in October, 1981, the Air Force abandoned its plan to file a Final Environmental Impact Statement (FEIS). However, since the FEIS was nearing completion when plans for deployment were canceled, the Air Force decided to publish the work in progress at that point as a Preliminary Final Environmental Impact Statement (PFEIS)

The MX Missile Base Siting Verification Studies were prepared by FUGRO, a consultant for the Air Force between 1978 and 1980. The purpose of these survey reports was to evaluate the physical characteristics of potential MX missile basing sites in Utah and Nevada. Focusing upon the geologic or natural factors which might affect physical deployment of the system, the reports contain surveys of biological resources, earthquake zones, soil characteristics, gravity surveys for predicting ground motion, water location and availability data. etc..

MX Missile Site Field Survey Studies, prepared for the Air Force by ERTEC Corp., consist of maps, survey data, and an assessment of construction needs for proposed basing sites. Biological and cultural resources of Dry Lake Valley, Nevada, and Pine and Wah Wah Valleys, Utah, are described. The studies were conducted in 1981 and focus upon specific sites where construction of storage sites and the tracking system would most likely begin.

The MX Base Comprehensive Planning Reports consist of interim and final reports produced by EDAW, another major consultant hired by the Air Force. The focus of these is the standards to be used in the selection of the locations of main operating bases as well as plans for their construction. Comprehensive data management systems, social and environmental effects of missile bases, and the most efficient building and site layouts are all considered.

The U.S. Army Corps of Engineers Life Support Concept Study is intended to identify the number and types of personnel that would be needed for the construction of main operating bases, and to study the living conditions under which they would work. The ability of the local area to provide support facilities and services to the construction effort and to provide a comfortable living environment is assessed.

Arrangement

Alphanumerical by subseries.

Related Records

Governor's MX missile correspondence from the MX Coordination Office, Series 4247, contains a report often cited by the Governor.

MX missile deployment impact planning and subject files from the MX Coordination Office, Series 4250, contains very closely related coordination and planning activities also documented in this series.

MX Draft Environmental Impact Statement evaluation records from the MX Coordination Office, Series 4251, contains the evaluation of the Draft Environmental impact statement found in this series.

Federal aid programs subject files from the MX Coordination Office, Series 4252, contains detailed information about specific impacts of missile deployment.

Four corners regional commission fiscal records from the MX Coordination Office, Series 4253, contains several technical studies discussed in these reports.

Custody History

After the Utah MX Coordination Office was closed in 1981, the State Office of Planning and Budget acquired most of the records and used them as a reference resource. The missile siting studies were housed at the Utah Department of Natural Resources. Transfer to the Archives occurred in 1984-1985.

Access Restrictions

This series is classified as Public.

Preferred Citation

Cite the Utah State Archives and Records Service, the creating agency name, the series title, and the series number.

Processing Note

Archival processing was completed in 1987 by Brent Brinkerhoff. Since many of the subseries of reports had become separated since the Utah MX Coordination Office closed, duplicate copies from other sources were often added to complete a set of reports. Extensive rearrangement of the reports was necessary in order to reconstruct the interrelationships between the subseries.

Indexing Terms

  • Intercontinental ballistic missile bases—Utah.
  • MX (Weapons system).
  • Nuclear arms control—Utah.

Container List

BOX FOLDER DESCRIPTION
1 1 Final Environmental Impact Statement: MX Milestone II; Volume I - Program Overview
1 2 Final Environmental Impact Statement: MX Milestone II; Volume II - Full Scale Engineering Development
1 3 Final Environmental Impact Statement: MX Milestone II; Volume III - Missile Flight Testing
1 4 Final Environmental Impact Statement: MX Milestone II; Volume IV - Basing Mode Evaluation
1 5 Final Environmental Impact Statement: MX Milestone II; Volume V - Appendices
1 6 Final Environmental Impact Statement: MX Milestone II; Public Comments
1 7 Final Environmental Impact Statement: MX Milestone II; Air Mobile Supplements
1 8 Final Environmental Impact Statement: MX Milestone II; Air Mobile Supplements
1 9 Environmental Technical Reports; N 104 - Technical Report: Planning, Federal Statutes, Scoping, Schedules, and Key Issues
1 10 Environmental Technical Reports; N 105-Legal Obligations for Identifying Historic Sites
1 11 Environmental Technical Reports; N 106-MX Map Siting Area Requirements For Nevada
1 12 Environmental Technical Reports; N 109-MX Siting Study Labor Requirements
1 13 Environmental Technical Reports; N 110-Procedures for Withdrawal of Lands Under the Federal Land Policy Management Act of 1976
1 14 Environmental Technical Reports; N 126-Summary Systems Study MX Support Facilities
1 15 Environmental Technical Reports; N 129-Imagery Criteria: Geothermal Resource Areas
1 16 Environmental Technical Reports; N 132-Constraint Level Selection Criteria for MX System Deployment
1 17 Environmental Technical Reports; N 133-Area Exclusions Resulting from MX Deployment Constraints
1 18 Environmental Technical Reports; N 134-Constraints to MX Deployment in Nevada and Utah.
1 19 Environmental Technical Reports; N 135-Landstat Derived Regional Inventories Area Surveys and Site Studies as a Basis for MX Project Planning, Engineering, and Design
1 20 Environmental Technical Reports; N 141-Deployment Area Selection Key Issues: Comments and Commitments
1 21 Environmental Technical Reports; N 144-Environmental Analysis of Alternative MX Deployment Modes
1 22 Environmental Technical Reports; N 149-Surface Water Hydrology
1 23 Environmental Technical Reports; N 150-MX Deployment Area Selection Issues: Summary
1 24 Environmental Technical Reports; N 152-Regional Socioeconomic Impacts of MX Base Creation and Operation
1 25 Environmental Technical Reports; N 153-Employment History of the Aerospace Industry
1 26 Environmental Technical Reports; N 154-""Acceptability"" of an Environmental Impact Statement
1 27 Environmental Technical Reports; N 162-Key Issues and Selection of Environmental Variables
1 28 Environmental Technical Reports; N 163-Emigrant Valley Basing Mode Evaluation Area
1 29 Environmental Technical Reports; N 164-Hydrologic Impacts and Relative Site Ranking
1 30 Environmental Technical Reports; N 166-Summary of Onbase Socioeconomic Impacts
1 31 Environmental Technical Reports; N 171-Environmental Impacts of Candidate Basing Modes
1 32 Environmental Technical Reports; N 181-National Economic Impacts of MX Full-Scale Engineering Development
1 33 Environmental Technical Reports; N 190-The Present Value of Agricultural Production Lost
1 34 Environmental Technical Reports; N 196-Energy Issues in Potential MX Siting Areas
1 35 Environmental Technical Reports; N 197-Preliminary Assessment of Solar and Geothermal Energy as a Source of Electricity for the MX Program
1 36 Environmental Technical Reports; N 198-A, Construction/Operations Scenario for the MX System and Preparation of the MX Deployment
1 37 Environmental Technical Reports; N 418-Area Selection/Land Withdrawal Application Environmental Impact Statement
1 38 Environmental Technical Reports; Appendix 1-1-Soil Handling Procedures to Maximize Revegetation Potential in the Nevada/Utah Candidate Siting Region for the MX Missile System
1 39 Environmental Technical Reports; Econometric Model of the State of Nevada
1 40 Environmental Technical Reports; Range and Wildlife Ecology and Management
2 1 MX Draft Environmental Impact Statement Technical Reports; ETR 255-Preliminary Summary: Socioeconomic Models, Assumptions, Computations, and Results of MX Deployment in the Nevada/Utah Study Area
2 2 MX Draft Environmental Impact Statement Technical Reports; ETR 270-Geographical Requirements for Withdrawal Procedures
2 3 MX Draft Environmental Impact Statement Technical Reports; ETR 315-Vegetation Inventory
2 4 MX Draft Environmental Impact Statement Technical Reports; ETR 320-Wilderness and Significant Natural Areas Inventory
2 5 MX Draft Environmental Impact Statement Technical Reports; ETR 325-Overview Inventory of Flood plains, and Aquatic Habitats and Biota
2 6 MX Draft Environmental Impact Statement Technical Reports; ETR 330-Protected Species Inventory
2 7 MX Draft Environmental Impact Statement Technical Reports; ETR 335-Wildlife and Key Wildlife Habitat Inventory
2 8 MX Draft Environmental Impact Statement Technical Reports; ETR 340-A Description of Land Ownership and Administration in Nevada and Utah
2 9 MX Draft Environmental Impact Statement Technical Reports; ETR 345-A Description of Land Use Patterns in Nevada and Utah
2 10 MX Draft Environmental Impact Statement Technical Reports; ETR 350-A Description of Land Use Controls and Constraints and the Economy in Nevada and Utah
2 11 MX Draft Environmental Impact Statement Technical Reports; ETR 355-A Description of the Labor Force in Nevada and Utah
2 12 MX Draft Environmental Impact Statement Technical Reports; ETR 360-A Description of the Population in Nevada and Utah
2 13 MX Draft Environmental Impact Statement Technical Reports; ETR 365-A Description of the Housing, Community Facilities and Infrastructure in Nevada and Utah
2 14 MX Draft Environmental Impact Statement Technical Reports; ETR 370-A Description of Local Government Finances in Nevada and Utah
2 15 MX Draft Environmental Impact Statement Technical Reports; ETR 375-Future Conditions of Agriculture, Grazing, Mining, and Recreation without the MX Project
2 16 MX Draft Environmental Impact Statement Technical Reports; ETR 380-Future Conditions of the Economy without the MX Project
2 17 MX Draft Environmental Impact Statement Technical Reports; ETR 385-Statutory Authority for Preservation of Cultural Resources
2 18 MX Draft Environmental Impact Statement Technical Reports; ETR 390-An Overview of Archaeological and Historical Resources in the Nevada/Utah Siting Region
2 19 MX Draft Environmental Impact Statement Technical Reports; ETR 395-Native American Concerns in the Nevada/Utah Siting Region
2 20 MX Draft Environmental Impact Statement Technical Reports; ETR 400-Statutory Programs Interacting with MX
2 21 MX Draft Environmental Impact Statement Technical Reports; ETR 405-Legal Requirements for MX Land Withdrawal
2 22 MX Draft Environmental Impact Statement Technical Reports; ETR 410-Water Rights in the Public Domain: Legal Availability of Water for MX
2 23 MX Draft Environmental Impact Statement Technical Reports; ETR 415-Pollution Control Laws Relating to Construction and Operation of MX
2 24 MX Draft Environmental Impact Statement Technical Reports; ETR 420-Environmental Laws Potentially Affecting MX
2 25 MX Draft Environmental Impact Statement Technical Reports; ETR 430-Summary Overview of Selected Communities in the Nevada/Utah Siting Region
2 26 MX Draft Environmental Impact Statement Technical Reports; ETR 435-Summary Characteristics of Watersheds with Geotechnically Suitable Land in the Nevada/Utah Study Region
2 27 MX Draft Environmental Impact Statement Technical Reports; ETR 440-Summary Characteristics of Potentially Secondarily Impacted Watersheds in the Nevada/Utah Study Region
2 28 MX Draft Environmental Impact Statement Technical Reports; ETR 445-Environmental Constraints Analysis of Potential MX Operating Base Locations
2 29 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Volume I-Program Overview Volume two is missing
2 30 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Volume III-Part 1 and 2-Affected Environment
2 31 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Volume III-Part 1 and 2-Affected Environment
2 32 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Volume IV, Parts 1 to 3-Environmental Consequences to the Study Regions and Operating Base Vicinities
2 33 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Volume IV, Parts 1 to 3-Environmental Consequences to the Study Regions and Operating Base Vicinities
2 34 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Volume IV, Parts 1 to 3-Environmental Consequences to the Study Regions and Operating Base Vicinities
2 35 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Volume V, Appendices
2 36 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; Summary
3 1 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 1-Locational Alternatives
3 2 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2-Designated Deployment Area: Nevada/Utah
3 3 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2A-Nevada/Utah DDA
3 4 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2B-Beaver
3 5 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2C-Clark
3 6 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2D-Eureka
3 7 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2E-Iron
3 8 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2F-Juab
3 9 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2G-Lincoln
3 10 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2H-Millard
3 11 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2I-Nye
3 12 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2J-Salt Lake/Utah
3 13 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2K-Washington
3 14 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 2L-White Pine
3 15 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 3-Designated Deployment Area: Texas/New Mexico
3 16 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 3A-DDA: Texas/New Mexico
3 17 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 3B-Texas Counties
3 18 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 3C-New Mexico ROI Counties
3 19 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 4-Operating Base: Ely
3 20 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 5- Operating Base: Coyote
3 21 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 6-Operating Base: Beryl
3 22 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 7-Operating Base: Delta
3 23 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 8-Operating Base: Clovis
3 24 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 9-Operating Base: Dalhart
3 25 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 10-Noise
3 26 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 11-Geology and Mining
3 27 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 12-Water Resources
3 28 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 13-Atmospheric Resources
3 29 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 14-Vegetation
3 30 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 15-Wildlife
3 31 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 16-Aquatic Habitats and Biota
3 32 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 17-Protected Species
3 33 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 18-Natural Areas
3 34 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 19-Traffic
4 1 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 20-Land Use
4 2 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 21-Native Americans Nevada/Utah
4 3 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 22-Native Americans Texas/New Mexico
4 4 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 23-Cultural Resources
4 5 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 24-Energy
4 6 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 25-Cement
4 7 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 26-Steel
4 8 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 27-Economic Model
4 9 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 28-Social Model
4 10 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 29-Public Finance Model
4 11 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 30-Indirect Effects
4 12 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 31-Construction
4 13 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 32-Systematic Ranking Methodology
4 14 Deployment Area Selection and Land Withdrawal/acquisition Draft Environmental Impact Statement- (Deis) Technical Reports; ETR 33-Operating Base: Milford
4 15 Preliminary Final Environmental Impact Statement Reports; Chapter I-Program Overview
4 16 Preliminary Final Environmental Impact Statement Reports; Chapter II-Comparative Analysis of Alternatives
4 17 Preliminary Final Environmental Impact Statement Reports; Chapter III, Volume I-Affected Environment
4 18 Preliminary Final Environmental Impact Statement Reports; Chapter III, Volume II-Affected Environment
4 19 Preliminary Final Environmental Impact Statement Reports; Chapter IV, Volume I-Environmental Consequences to the Study Regions and Operating Base Vicinities
4 20 Preliminary Final Environmental Impact Statement Reports; Chapter IV, Volume II-Environmental Consequences to the Study Regions and Operating Base Vicinities
4 21 Preliminary Final Environmental Impact Statement Reports; Chapter V-Appendices
4 22 Preliminary Final Environmental Impact Statement Reports; Chapter VI-Public Comments
5 1 Preliminary Final Environmental Impact Statement Reports; ETR 1-Locational Alternatives
5 2 Preliminary Final Environmental Impact Statement Reports; ETR 2A-Nevada/ Utah Designated Deployment Area
5 3 Preliminary Final Environmental Impact Statement Reports; ETR 2B-Beaver County, Utah
5 4 Preliminary Final Environmental Impact Statement Reports; ETR 2C-Clark County, Nevada
5 5 Preliminary Final Environmental Impact Statement Reports; ETR 2D-Eureka County, Nevada
5 6 Preliminary Final Environmental Impact Statement Reports; ETR 2E-Iron County, Utah
5 7 Preliminary Final Environmental Impact Statement Reports; ETR 2F-Juab County, Utah
5 8 Preliminary Final Environmental Impact Statement Reports; ETR 2G-Lincoln County, Nevada
5 9 Preliminary Final Environmental Impact Statement Reports; ETR 2H-Millard County, Utah
5 10 Preliminary Final Environmental Impact Statement Reports; ETR 2I-Nye County, Nevada
5 11 Preliminary Final Environmental Impact Statement Reports; ETR 2J-Salt Lake/Utah Counties
5 12 Preliminary Final Environmental Impact Statement Reports; ETR 2K-Washington County, Utah
5 13 Preliminary Final Environmental Impact Statement Reports; ETR 2L-White Pine County, Nevada
5 14 Preliminary Final Environmental Impact Statement Reports; ETR 3A-Texas/New Mexico Designated Deployment Area
5 15 Preliminary Final Environmental Impact Statement Reports; ETR 3B-Texas
5 16 Preliminary Final Environmental Impact Statement Reports; ETR 3C-New Mexico, ETR's 4 thru 9 are missing
5 17 Preliminary Final Environmental Impact Statement Reports; ETR 10-Noise
5 18 Preliminary Final Environmental Impact Statement Reports; ETR 11-Mining and Geology
5 19 Preliminary Final Environmental Impact Statement Reports; ETR 12-Water Resources
5 20 Preliminary Final Environmental Impact Statement Reports; ETR 13-Atmospheric Resources
5 21 Preliminary Final Environmental Impact Statement Reports; ETR 14-Native Vegetation
5 22 Preliminary Final Environmental Impact Statement Reports; ETR 15-Wildlife
5 23 Preliminary Final Environmental Impact Statement Reports; ETR 16-Aquatic Habitats and Biota
5 24 Preliminary Final Environmental Impact Statement Reports; ETR 17, Volume 1-Protected Species
5 25 Preliminary Final Environmental Impact Statement Reports; ETR 17, Volume 2-Protected Species
5 26 Preliminary Final Environmental Impact Statement Reports; ETR 18-Wilderness/Natural Areas
6 1 Preliminary Final Environmental Impact Statement Reports; ETR 19-Transportation
6 2 Preliminary Final Environmental Impact Statement Reports; ETR 20-Land Ownership/Land Use
6 3 Preliminary Final Environmental Impact Statement Reports; ETR 21-Native Americans in Nevada/Utah
6 4 Preliminary Final Environmental Impact Statement Reports; ETR 22-Native Americans in Texas/New Mexico
6 5 Preliminary Final Environmental Impact Statement Reports; ETR 23-Archaeology
6 6 Preliminary Final Environmental Impact Statement Reports; ETR 24-Power and Energy
6 7 Preliminary Final Environmental Impact Statement Reports; ETR 25-Cement Industry
6 8 Preliminary Final Environmental Impact Statement Reports; ETR 26-Steel Industry
6 9 Preliminary Final Environmental Impact Statement Reports; ETR 27-Economic Model
6 10 Preliminary Final Environmental Impact Statement Reports; ETR 28-Community Services and Infrastructure Model
6 11 Preliminary Final Environmental Impact Statement Reports; ETR 29-Public Finance Model
6 12 Preliminary Final Environmental Impact Statement Reports; ETR 30-Indirect Effects Model
6 13 Preliminary Final Environmental Impact Statement Reports; ETR 31-Construction
6 N/A Final Environmental Impact Statement Reports; ETR'S 32 and 33 are missing
6 14 Preliminary Final Environmental Impact Statement Reports; ETR 34-Wind Erosion
6 15 Preliminary Final Environmental Impact Statement Reports; ETR 35-Quality of Life
6 16 Preliminary Final Environmental Impact Statement Reports; ETR 36-Urban Growth and Planning
6 17 Preliminary Final Environmental Impact Statement Reports; ETR 37-Community Allocation Model
6 18 Preliminary Final Environmental Impact Statement Reports; ETR 38-Mitigations
6 19 Preliminary Final Environmental Impact Statement Reports; ETR 39-Haste water Analysis
6 20 Preliminary Final Environmental Impact Statement Reports; ETR 40-Grazing, ETR 41 is missing
6 21 Preliminary Final Environmental Impact Statement Reports; ETR 42-Planning by the Air Force
6 22 Preliminary Final Environmental Impact Statement Reports; ETR 43-Public Health Concerns
6 23 Preliminary Final Environmental Impact Statement Reports; ETR 44-Regional Economic Analysis
6 24 Preliminary Final Environmental Impact Statement Reports; Aggregate Resources
6 25 Preliminary Final Environmental Impact Statement Reports; Aggregate Resources
6 26 Preliminary Final Environmental Impact Statement Reports; Aggregate Resources
6 27 Preliminary Final Environmental Impact Statement Reports; Aggregate Resources
6 28 Preliminary Final Environmental Impact Statement Reports; Aggregate Resources
6 29 Preliminary Final Environmental Impact Statement Reports; Aggregate Resources
7 1 Preliminary Final Environmental Impact Statement Reports; Biological and Cultural Resources
7 2 Preliminary Final Environmental Impact Statement Reports; Biological and Cultural Resources
7 3 Preliminary Final Environmental Impact Statement Reports; Biological and Cultural Resources
7 4 Preliminary Final Environmental Impact Statement Reports; Biological and Cultural Resources
7 5 Preliminary Final Environmental Impact Statement Reports; Biological and Cultural Resources
7 6 Preliminary Final Environmental Impact Statement Reports; Energy Sources
7 7 Preliminary Final Environmental Impact Statement Reports; Energy Sources
7 8 Preliminary Final Environmental Impact Statement Reports; Energy Sources
7 9 Preliminary Final Environmental Impact Statement Reports; Energy Sources
7 10 Preliminary Final Environmental Impact Statement Reports; Executive Summary
7 11 Preliminary Final Environmental Impact Statement Reports; Faults and Earthquake Hazards
7 12 Preliminary Final Environmental Impact Statement Reports; Geotechnical Briefing
7 13 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 14 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 15 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 16 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 17 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 18 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 19 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 20 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 21 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 22 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 23 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 24 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 25 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 26 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 27 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 28 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 29 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 30 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 31 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 32 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 33 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
7 34 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
8 1 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
8 2 Preliminary Final Environmental Impact Statement Reports; Geotechnical Evaluation
8 3 Preliminary Final Environmental Impact Statement Reports; Gravity Survey
8 4 Preliminary Final Environmental Impact Statement Reports; Gravity Survey
8 5 Preliminary Final Environmental Impact Statement Reports; Gravity Survey
8 6 Preliminary Final Environmental Impact Statement Reports; Maps
8 7 Preliminary Final Environmental Impact Statement Reports; Maps
8 8 Preliminary Final Environmental Impact Statement Reports; Maps
8 9 Preliminary Final Environmental Impact Statement Reports; Maps
8 10 Preliminary Final Environmental Impact Statement Reports; Maps
8 11 Preliminary Final Environmental Impact Statement Reports; Maps
8 12 Preliminary Final Environmental Impact Statement Reports; Maps
8 13 Preliminary Final Environmental Impact Statement Reports; Maps
8 14 Preliminary Final Environmental Impact Statement Reports; Maps
8 15 Preliminary Final Environmental Impact Statement Reports; Maps
8 16 Preliminary Final Environmental Impact Statement Reports; Maps
8 17 Preliminary Final Environmental Impact Statement Reports; Maps
8 18 Preliminary Final Environmental Impact Statement Reports; Maps
8 19 Preliminary Final Environmental Impact Statement Reports; Maps
8 20 Preliminary Final Environmental Impact Statement Reports; Maps
8 21 Preliminary Final Environmental Impact Statement Reports; Maps
8 22 Preliminary Final Environmental Impact Statement Reports; Maps
8 23 Preliminary Final Environmental Impact Statement Reports; Maps
8 24 Preliminary Final Environmental Impact Statement Reports; Maps
8 25 Preliminary Final Environmental Impact Statement Reports; Maps
8 26 Preliminary Final Environmental Impact Statement Reports; Maps
8 27 Preliminary Final Environmental Impact Statement Reports; Maps
8 28 Preliminary Final Environmental Impact Statement Reports; Maps
8 29 Preliminary Final Environmental Impact Statement Reports; Maps
8 30 Preliminary Final Environmental Impact Statement Reports; Maps
8 31 Preliminary Final Environmental Impact Statement Reports; Maps
8 32 Preliminary Final Environmental Impact Statement Reports; Maps
8 33 Preliminary Final Environmental Impact Statement Reports; Maps
8 34 Preliminary Final Environmental Impact Statement Reports; Maps
8 35 Preliminary Final Environmental Impact Statement Reports; Maps
8 36 Preliminary Final Environmental Impact Statement Reports; Maps
8 37 Preliminary Final Environmental Impact Statement Reports; Maps
8 38 Preliminary Final Environmental Impact Statement Reports; Maps
8 39 Preliminary Final Environmental Impact Statement Reports; Maps
8 40 Preliminary Final Environmental Impact Statement Reports; Maps
8 41 Preliminary Final Environmental Impact Statement Reports; Maps
8 42 Preliminary Final Environmental Impact Statement Reports; Maps
8 43 Preliminary Final Environmental Impact Statement Reports; Maps
8 44 Preliminary Final Environmental Impact Statement Reports; Maps
8 45 Preliminary Final Environmental Impact Statement Reports; Maps
8 46 Preliminary Final Environmental Impact Statement Reports; Maps
8 47 Preliminary Final Environmental Impact Statement Reports; Maps
8 48 Preliminary Final Environmental Impact Statement Reports; Maps
8 49 Preliminary Final Environmental Impact Statement Reports; Maps
8 50 Preliminary Final Environmental Impact Statement Reports; Maps
8 51 Preliminary Final Environmental Impact Statement Reports; Maps
8 52 Preliminary Final Environmental Impact Statement Reports; Maps
8 53 Preliminary Final Environmental Impact Statement Reports; Maps
8 54 Preliminary Final Environmental Impact Statement Reports; Maps
8 55 Preliminary Final Environmental Impact Statement Reports; Maps
8 56 Preliminary Final Environmental Impact Statement Reports; Maps
8 57 Preliminary Final Environmental Impact Statement Reports; Maps
8 58 Preliminary Final Environmental Impact Statement Reports; Maps
8 59 Preliminary Final Environmental Impact Statement Reports; Maps
8 60 Preliminary Final Environmental Impact Statement Reports; Maps
8 61 Preliminary Final Environmental Impact Statement Reports; Maps
8 62 Preliminary Final Environmental Impact Statement Reports; Maps
8 63 Preliminary Final Environmental Impact Statement Reports; Maps
8 64 Preliminary Final Environmental Impact Statement Reports; Maps
8 65 Preliminary Final Environmental Impact Statement Reports; Maps
8 66 Preliminary Final Environmental Impact Statement Reports; Maps
8 67 Preliminary Final Environmental Impact Statement Reports; Maps
8 68 Preliminary Final Environmental Impact Statement Reports; Siting Investigation-Summary of Suitable Area
8 69 Preliminary Final Environmental Impact Statement Reports; Water Law-Procedures for Rights Acquisition
8 70 Preliminary Final Environmental Impact Statement Reports; Water Resources
8 71 Preliminary Final Environmental Impact Statement Reports; Water Resources-Industry Activity
8 72 Preliminary Final Environmental Impact Statement Reports; Water-Supply and Waste Water Treatment Facilities
8 73 MX Missile Site Field Survey Studies; Volume I - Program Overview and Methodology
8 74 MX Missile Site Field Survey Studies; Volume I - Program Overview and Methodology
8 75 MX Missile Site Field Survey Studies; Volume I - Program Overview and Methodology
8 76 MX Missile Site Field Survey Studies; Volume I - Program Overview and Methodology
8 77 MX Missile Site Field Survey Studies; Volume I - Program Overview and Methodology
8 78 MX Missile Site Field Survey Studies; Volume I - Program Overview and Methodology
8 79 MX Missile Site Field Survey Studies; Volume I - Program Overview and Methodology
9 1 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 2 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 3 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 4 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 5 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 6 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 7 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 8 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 9 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 10 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 11 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 12 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 13 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 14 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 15 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 16 MX Missile Site Field Survey Studies; Volume II, Parts 1 and 2-Biological Resources Study
9 17 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 18 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 19 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 20 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 21 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 22 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 23 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 24 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 25 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 26 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 27 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 28 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 29 MX Missile Site Field Survey Studies; Volume III, Parts 1 and 2-Cultural Resources Study
9 30 MX Base Comprehensive Planning Reports; Executive Summary
9 31 MX Base Comprehensive Planning Reports; Deliverable 1, Interim Report 1-Functional Relationship Analysis
9 32 MX Base Comprehensive Planning Reports; Deliverable 1-Final Report-Functional Relationship Analysis
9 33 MX Base Comprehensive Planning Reports; Deliverable 3, Interim Report 1-Modular/Prefabricated Construction Capability and Evaluation
9 34 MX Base Comprehensive Planning Reports; Deliverable 4, Interim Report 1-Life Support System Concept Evaluation-Milford
9 35 MX Base Comprehensive Planning Reports; Deliverable 5, Interim Report 1-Framework for Data Management
9 36 MX Base Comprehensive Planning Reports; Deliverable 6 and 7, Interim Report 1-Synthesis, Overview, and Executive Summary
9 37 MX Base Comprehensive Planning Reports; Deliverable 8, Interim Report 1-Land Use Plan-Milford
9 38 MX Base Comprehensive Planning Reports; Deliverable 9, Interim Report 1-Aicuz Study
9 39 MX Base Comprehensive Planning Reports; Deliverable 10, Interim Report 1-Transportation Plan-Beryl and Milford
9 40 MX Base Comprehensive Planning Reports; Deliverable 10, Interim Report 1-Transportation Plan-Beryl and Milford
9 41 MX Base Comprehensive Planning Reports; Deliverable 11, Interim Report 1-Natural Resources
9 42 MX Base Comprehensive Planning Reports; Deliverable 12, Interim Report 1-Environmental Quality Plan
9 43 MX Base Comprehensive Planning Reports; Deliverable 13, Interim Report 1-Energy Plan - Beryl and Milford
9 44 MX Base Comprehensive Planning Reports; Deliverable 13, Interim Report 1-Energy Plan - Beryl and Milford
9 45 MX Base Comprehensive Planning Reports; Deliverable 15, Interim Report 1-Utility Systems-8eryl
10 1 MX Base Comprehensive Planning Reports; Deliverable 15, Interim Report 1-Utility Systems-Milford
10 2 MX Base Comprehensive Planning Reports; Deliverable 16, Interim Report 1-Communication Systems
10 3 MX Base Comprehensive Planning Reports; Deliverable 21, Interim Report 1-Comprehensive Design Guidance
10 4 MX Base Comprehensive Planning Reports; Deliverable 24, Final Report-Work Plan
10 5 MX Base Comprehensive Planning Reports; Deliverables 5 and 25, Final Reports-Framework for Data Management
10 6 MX Base Comprehensive Planning Reports; Addendum to revised Annotated MX Base Comprehensive Plan-Statement of Work
10 7 MX Base Comprehensive Planning Reports; Annotated Statement of Work for MX Base Comprehensive Planning
10 8 MX Base Comprehensive Planning Reports; Human Needs Assessment/Problem Production Mitigation Related to MX Missile Site Impact
10 9 MX Base Comprehensive Planning Reports; Site Selection Process
10 10 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.1-Life Support Concept Study Overview
10 11 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.2-Work Plan Coordination Point 1
10 12 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.3-Historical Research and Analysis of Remote Area Life Support Projects
10 13 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.4-Dependent Restriction Alternatives
10 14 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.5-Identification of Functions and Services
10 15 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.6-Recommended Levels of Standard Criteria
10 16 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.7-Final Standard Criteria
10 17 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.8-Alternative Site Specific Concepts
10 18 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.9-Cost Analysis of Life Support Functions and Services to be Provided
10 19 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.10-Identify and Analyze the Environmental and Socio-Economic Impacts of Alternative Concepts
10 20 U.S. Army Corps of Engineers Life Support Concept Study; Submittal 4.11-Alternative Financial Management Plans for Government Reimbursement
10 21 U.S. Army Corps of Engineers Life Support Concept Study; Option IV-Alternative Contract Methods of Government Providing Life Support